BS 7671 Amendment 4 and What It Means for UK Homes
- BS 7671 Amendment 4 Changes
- What BS 7671 18th Edition Amendment 4 Changes in the UK Wiring Regulations
- When Amendment 4:2026 to BS 7671 Applies, and Why Your Existing Wiring Is Not Suddenly Unsafe
- BS 7671 Amendment 4 2026 Changes Summary for Solar PV, Batteries and EV Charging
- BS 7671 Amendment 4 Plug in Solar and What UK Households Need to Know
- Your Responsibilities When Installing Solar Panels and Home Battery Storage
- Solving the Biggest Compliance Headaches in a Solar and Battery Setup
- Conclusion
- BS 7671 Amendment 4 FAQs
You've got a solar quote on the table, or you're eyeing a home battery, and then someone mentions the "orange book". Does it change your plans? Does your existing wiring suddenly fail? Nobody really explains what this means for your household. The BS 7671 Amendment 4 was officially published on 15 April 2026, and it’s the fourth update to the 18th Edition of the IET Wiring Regulations in the UK. It’s the national standard for low-voltage electrical installations. Its implementation began on 15 October 2026, which means all new installations in your home must follow it.
This guide looks at:
What BS 7671 18th Edition Amendment 4 changes in the UK wiring regulations
When Amendment 4:2026 to BS 7671 applies, and why your existing wiring is not suddenly unsafe
BS 7671 Amendment 4 2026 changes summary for solar PV, batteries and EV charging
BS 7671 Amendment 4 plug-in solar and what UK households need to know
What you're responsible for when you install solar and storage
How to avoid the biggest compliance headaches in a solar and home energy storage

BS 7671 Amendment 4 Changes
Topic | What Changed in Amendment 4:2026 | Impact on UK Homeowners |
Home Battery Storage | Added Chapter 57 that introduces dedicated rules for secondary batteries, covering earthing, RCD protection, DC-side fault protection, isolation, and labelling (aligning with PAS 63100, including loft installation bans). | Installers must follow rigorous safety and protection protocols; batteries are legally treated as generating sets rather than simple loads. |
Solar PV & Earthing | Redrafted Regulation 551.7.1 restricting connections of power sources to the load side of an RCD in specific cases. Clarified PNB (Protective Neutral Bonding) under PME supplies. | Your electrician must verify your home's earthing arrangement (e.g., via ENA G12) and configure the consumer unit wiring safely. |
Plug-In Balcony Solar | Separate statutory regulations (SI 2026/848 effective August 2026) establish a legal framework for plug-in solar kits up to an 800W AC limit. | Allows a simpler, low-cost self-generation option for Great Britain homes, though separate from hardwired systems and battery storage. |
EV Charger Circuits | Arc Fault Detection Devices (AFDDs) are exempted for EV charging circuits complying with BS EN 61851 and socket-outlets to BS EN IEC 62196-2. | Simplifies the consumer unit setup when installing an EV charger alongside solar PV without unnecessary extra components. |
EICR Reporting | Appendix 6 model revised under Regulations 653.1 and 653.2, updating recipient guidance and allowing photographic/thermographic image attachments. | Periodic inspection reports are clearer, more transparent, and easier for buyers or insurers to understand during a property sale. |
What BS 7671 18th Edition Amendment 4 Changes in the UK Wiring Regulations
BS 7671 Amendment 4 Changes at a Glance
The BS 7671 Amendment 4 is the biggest shake-up to the UK wiring rules since 2022. It targets homes generating and storing their own power. It's the second full consolidated amendment to the 18th Edition. It folds Amendment 3:2024 into the main text. These are the headline additions:
A new chapter on stationary secondary batteries (Chapter 57)
A new section on Power over Ethernet (Section 716)
A new section on functional earthing for ICT equipment
A major revision of medical locations (Section 710)
Why does this matter? Electricians and installers now have a clearer rulebook while the wider industry now has a shared baseline. Chapter 57 is the one to watch out for UK households because it’s now the first time home batteries have their own dedicated rules.
What Is Genuinely New and What Is Existing Practice
The battery chapter is where most of what’s new is. It adds rules for selecting, protecting, isolating and labelling stationary batteries, and we'll cover those shortly.
Some existing rules have been clarified or redrafted rather than replaced. That includes generating sets and protective devices (551.7), RCD selection (531.3.3) and protective neutral bonding (PNB). The wording might sound tighter, but the aim is the same—sources of supply must be connected safely.
And the rest? Unchanged in most homes. The core rules on cables, RCD protection and earthing carry over, so everyday circuit work looks much as it did before.
When Amendment 4:2026 to BS 7671 Applies, and Why Your Existing Wiring Is Not Suddenly Unsafe
Amendment 4:2026 to BS 7671 is the edition your electrician must now design new work to. This does not mean that you have to rip out what's already installed in your walls.
The BS 7671 Amendment 4 2026 Timeline and Six-Month Transition
The BS 7671 Amendment 4 2026 was published on 15 April 2026 and could be used right away. The previous edition—BS 7671:2018+A2:2022+A3:2024—was withdrawn on 15 October 2026. There was a six month transition window between the new amendments and the old rules.
During that window, work designed to the old edition before the cut-off could still be completed and verified to it, subject to contract. That's over. Any new installation from 15 October onwards must follow BS 7671 18th edition Amendment 4, so if your quote predates October, ask which edition the design used.
Dates and requirements can change. Always check the IET and BSI websites for the latest position.
Why an Older Installation Is Not Automatically Unsafe
An installation built to an earlier edition is unlikely to comply with the latest one. That doesn't make it unsafe, and it doesn't mean you must upgrade it. SELECT’s guidance says the same.
So keep calm. What matters is its condition: has it been inspected, tested and maintained? A periodic inspection is how you find out. If you add solar or storage, the new work follows the current edition, and your electrician will flag any existing circuit that needs attention first.
What the Revised EICR Means for Homeowners
An Electrical Installation Condition Report (EICR) is the formal record of your wiring's condition after periodic inspection and testing. Regulation 653.1 and 653.2 requires it to follow the revised Appendix 6 model. The form has major changes, and the guidance for the person receiving the report has been redrafted to read more clearly.
One handy addition: photographic and/or thermographic images can now be appended to the report. So instead of a vague note about a warm connection, you can see it.
Tie this to your next inspection or a property sale. If you're selling, a recent EICR in the new format gives a buyer a clearer picture of what they're getting.
BS 7671 Amendment 4 2026 Changes Summary for Solar PV, Batteries and EV Charging
The BS 7671 Amendment 4 2026 changes summary for your household boils down to three areas: batteries, solar earthing and EV chargers.
The New Rules for Home Battery Storage
Chapter 57 is the new part of the regulations covering stationary secondary batteries—the fixed units that store solar power in your home. SELECT counts more than 18 new regulations in it. They cover selecting the battery, the power conversion equipment and the energy management system. They also cover earthing, RCD protection, DC-side fault protection, isolation, and identification and notices. This chapter also talks about where you can install batteries—lofts, bedrooms, escape routes and roof spaces are now prohibited.
Regulation 551.7 shifts how batteries are viewed. Stationary batteries are treated as generating sets, not loads, because they can feed power back as well as draw it. They must be installed on the supply side of the protective devices. And where energy flow is bidirectional, a suitable protective device is required.
These BS 7671 Amendment 4 changes are why your installer will ask more questions about protection, isolation and labelling.
Solar PV, Earthing and PNB
Regulation 551.7.1 has been redrafted. It restricts connecting a source to the load side of an RCD in certain cases, so how your inverter or battery is wired into the consumer unit matters.
PNB is now defined in the text, and PME conditions can apply. That matters for solar, battery and EV installs on a PME supply, a common earthing arrangement in UK homes. The text points to ENA Engineering Recommendation G12 Issue 5 for the detail. Your electrician should confirm your supply's earthing before designing anything.
EV Charger Circuits and Arc Fault Protection
Arc fault detection devices (AFDDs) are not required for circuits supplying EV charging equipment that meets BS EN 61851 and has socket-outlets or vehicle connectors to BS EN IEC 62196-2. That's welcome news if you're adding a charger alongside solar. It can keep the consumer unit simpler. Your installer still designs the circuit to the rest of the regulations, including RCD protection and earthing.
BS 7671 Amendment 4 Plug in Solar and What UK Households Need to Know
What Plug-In Solar Is and the 800W Limit
Plug-in solar (often called balcony solar) is a small, self-contained kit that hangs off a balcony or leans against a garden wall. The UK cap is 800W of AC output, in line with the German model that popularised the idea. Interest has grown because you want a simple, lower-cost way to generate your own power. DESNZ cites savings of up to £110 a year, though your result depends on orientation and daytime use. The rules cover Great Britain, not Northern Ireland.
Note: Savings and rules can change. Check the official UK government portal, DESNZ and the Energy Saving Trust for current guidance, and Ofgem for energy price cap figures. |
|---|
Does BS 7671 Amendment 4 Itself Permit Plug-In Solar?
Some say Amendment 4 updated Section 712 to recognise small plug-connected PV. Others say the legal change came from separate legislation, reported as SI 2026/848 and in force from 27 August 2026. Treat the wiring regulations and the legal rules on connecting a kit to a socket as two separate pieces of the puzzle. The BS 7671 Amendment 4 plug in solar question needs both. And check that a kit meets UK requirements, not just a general safety mark.
Why Plug-In Kits Differ From a Hardwired Solar and Battery System
Small plug-in kits are not the same as a hardwired solar and battery system. The August rules cover solar generation only, so kits can't include a battery. A hardwired system, including the battery rules in the new Chapter 57, still needs a registered electrician to install and certify it. Which brings us to your own responsibilities.
Your Responsibilities When Installing Solar Panels and Home Battery Storage
Your responsibilities here come down to choosing the right person and keeping the right records.
Hire a Registered Installer and Ask for the Right Certificate
Use an installer registered with a competent person scheme such as NICEIC, NAPIT or SELECT. These schemes assess their members' work, which gives you a recognised route if something goes wrong. Ask for the certificate to reference BS 7671:2018+A4:2026. If it cites an older edition for work started after 15 October, ask why.
Check Protective Devices, Isolation and Grid Notification
Ask how your installer will handle protective devices, isolation, RCD protection and labelling. Those are the areas BS 7671 Amendment 4 tightened up for batteries.
Notifying your network operator is a general UK requirement for solar and storage. According to the ENA G98 requirements, you can connect smaller systems of up to 16A per phase then notify your network operator within 28 days. However, you need G99 approval first for larger systems. Your batteries export capability affects which approval process applies, and if you don’t know, ask your installer.
Note: Grid connection rules can change. Check the Energy Networks Association (ENA) and your network operator's website for the latest G98 and G99 requirements. |
|---|
Keep Your Paperwork for Insurance, Resale and Future Inspections
Keep every certificate your installer hands over, plus the commissioning records and your network operator's confirmation. Your insurer may ask for them after a claim. A buyer's solicitor will almost certainly ask for them at resale. And your next EICR inspector will want to see how the solar and battery were added.
Solving the Biggest Compliance Headaches in a Solar and Battery Setup
From the BS 7671 Amendment 4, two major pain points come up again and again—too many separate parts to certify, and the fear of replacing a system that already works.
Planning a New Solar-Plus-Storage System Without Piecing Together Separate Parts
If you're starting from scratch, your main worry is whether separate panels, an inverter and a battery will meet BS 7671 Amendment 4 together. Fewer parts means fewer things for your installer to specify and certify. A home battery storage solution like the EcoFlow STREAM 5000 brings a 5kWh battery and four solar inputs into one wall-mounted unit, accepting up to 5,000W of solar input. You can add more batteries later as your needs grow. It's supplied for hardwiring, so a registered electrician must install it and certify the work. Choosing the right product never replaces compliance.
Adding Battery Storage to Existing Solar Without Rebuilding the System
Already have panels on the roof? You may fear that adding storage means tearing out a working system. An AC-coupled battery avoids that. For example, the EcoFlow STREAM AC 5000 is a 5kWh battery wired in through your distribution board, so your existing panels and inverter stay where they are. It can charge at up to 3,000W from your home's AC supply and expands with extra batteries. A registered electrician must still install it and certify the work against the current regulations.
Conclusion
BS 7671 Amendment 4 is the current guidance for electrification. Any new installation in your home must comply with these new rules. This amendment doesn’t make your existing wiring unsafe. You can find rules and guidance on storage in Chapter 57. Small plug-in kits also have their own separate legal lane from hardwired systems. For your home’s housing needs, use a registered installer, ask for certification to BS 7671:2018+A4:2026, and plan solar and storage together.
BS 7671 Amendment 4 FAQs
Where Can I Download the BS 7671 Amendment 4 PDF?
The full text is a paid IET/BSI publication, so don't expect an official BS 7671 18th edition Amendment 4 pdf free download of the whole standard. Free trade-body summaries exist, such as SELECT’s "what's new" overview. Steer clear of unofficial copies, which may be outdated or incomplete. Any BS 7671 18th edition Amendment 4 pdf free download offer deserves suspicion.
Do I Need to Do a Course for Amendment 4?
Electricians are expected to keep up to date. One training provider says the City & Guilds 2382-22 exam was withdrawn and replaced by 2382-26 on 16 October 2026. Confirm details with City & Guilds and the scheme providers.
Which Appendix Has Been Removed From Amendment 4?
Appendix 17 (energy efficiency guidance) was removed. A new informative Chapter 81 points to the Building Regulations instead, according to SELECT.
Can You Be an Electrician Without the 18th Edition?
Ask for evidence of current competence and scheme registration before work starts.