Welcome to EcoFlow Support

Welcome to EcoFlow Support

We're here for you

FAQ

Why isn't my TOU schedule being executed?

"Here are a few reasons why your TOU schedule isn't executing: a. The battery has reached its charge limit. b. The battery level has dropped below the backup reserve level. c. Storm Guard has been activated due to severe weather conditions."

Do Smart Home Panel 3 or Smart Gateway have any requirements for the types of compatible rooftop photovoltaic systems?

Only compatible with grid-tied solar inverter system, not hybrid solar inverter system

Does the use of Smart Home Panel 3 or Smart Gateway have any requirements for the APP version?

You need APP version ≥ 6.8.5 to add Smart Home Panel 3 or Smart Gateway to the APP for use.

If my local electrical regulations require an Overcurrent Protection Device [OCPD] between the Battery and the Battery Box, where should I install it?

You can install an overcurrent protection device [OCPD] in the middle of the Smart Inlet Box Connection Cable (5P8 Port to 5P8 Port). The actual OCPD specifications shall comply with your local electrical regulations. We recommend that you use a 70A 2P circuit breaker.

Does the use of Smart Home Panel 3 or Smart Gateway have any requirements for the APP version?

You need APP version ≥ 6.8.5 to add Smart Home Panel 3 or Smart Gateway to the APP for use.

Contact us