• Product Introduction
What should I do if I want to use the device plug-and-play?

When connected to the power grid, STREAM 5000 automatically limits its output power to the maximum permitted under local regulations. In Germany, systems operating within the applicable simplified connection limits must be registered in the Marktstammdatenregister, and the local distribution network operator must be notified.